Our Projects
The company participated in the implementation of many construction projects in Iraq, including roads, water treatment plants, buildings, and other projects
Projects completed by the company's staff
Since the beginning of the company's establishment, we have implemented several projects, which we show below
- Establishment and construction of the Mahmoudia Statistics Division with two floors and a total area of 800 square meters, complete with all heating and cooling accessories and equipment, for the year 2010. The project duration is 180 days, with a contract amounting to 406,000,000 dinars. The company received a letter of thanks and appreciation from the Ministry of Planning.
- Rehabilitation and development of the Musayyib Statistics Division and the construction of the Great Lecture Hall at the Ministry of Planning / Central Bureau of Statistics for the year 2013, with a contract amounting to 228,000,000 dinars. The company received a book of good performance.
- Demolition and reconstruction of Al-Amin School, 12 classrooms, two floors, the administrative wing, and the health wing in the Diyala governorates, Al-Azim district, from the Reconstruction Fund for the year 2018, with a contract amounting to (750,000,000) dinars.
- Construction of two schools with 12 classrooms in Kirkuk Governorate – Saadia village, Jaafari, and Bai Hassan village for the year 2020, with a contract amounting to (1,220,000,000) dinars.
- Building three schools with 12 grades in Al-Thawra neighborhood, Al-Manzala village, and Al-Khabbaza village / Hawija district, Kirkuk Governorate for the year 2020, with an amount of (1,830,000,000) dinars. Final receipt.
- Demolition and reconstruction of Al-Khazir School (12 classrooms) in Al-Zab district – Hawija district, Kirkuk Governorate, within the reconstruction fund for the year 2022, with a contract amounting to 795,000,000 dinars.
- Installing and equipping a water station with a capacity of 200 cubic meters per hour, along with the extension of a network of pipes of various sizes, with a length of 24 km, including service rooms, a fence, and a parking yard in Anbar Governorate for the year 2010, with an amount of 750,000,000 dinars, which was finally received by the governorate.
- Installing and equipping two water stations with a capacity of 50 cubic meters per hour in the Bassam area, and the second with the fence and the service room for the year 2012, with a contract amounting to 600,000,000 dinars, received by the Baghdad Water Directorate / Baghdad Governorate.
- Rehabilitation and maintenance of water in Nuaimiya Al-Dafar Anbar Governorate for the year 2012 with a contract amount of (380,000,000) dinars.
- Miscellaneous works: Project works for the maintenance of molasses water projects and the establishment, rehabilitation, and treatment of water scarcity for the villages of Dibs district, as well as the establishment of a high tank with a height of 12 m and a capacity of 100 m3, with the extension of pipe networks of various sizes with a length of 25 km in Kirkuk Governorate for the year 2020, with a contract amounting to (1,430,000,000) dinars.
- Implementation of a project (rehabilitation of the road linking the Shwan district and Altun Kobri district and rehabilitation of the Shwan Taq Taq 15 km road) in Kirkuk Governorate for the year 2021, with a contract amounting to (2,816,000,000) dinars. The project has finally been received.
- Maintenance of generators in the Ministry of Health building in Baghdad. The company received a letter of thanks and appreciation.
- Implementation of the project to construct the second corridor of the Kirkuk-Al-Fatha Road – the second section with a length of 9 km for the benefit of Kirkuk Governorate for the year 2023-2024 with a contract value of (4,376,500,000) dinars, with a completion rate of (80%) so far.
- Building a camera room and installing surveillance cameras for the General Company for Electric Power Production – Northern Region Dibs Gas Power Station Project for the year 2021 with a contract amount of (27,000,000) dinars.
- Implementation of a project to construct a 33K double feeder at Fallujah Cement Station to South Fallujah Station (33/11KV) at the Ministry of Electricity – Baghdad Electricity Distribution Company for the year 2022 with a contract amounting to 375,000,000 dinars.
- Implementation of the rehabilitation works of the Karma Power Station 1 and the Karma Power Station 2, the rehabilitation of the Karma Sector electricity building, the rehabilitation of the Karma Island Power Station, the rehabilitation of the Saqlawiya Sector Building, the rehabilitation of the Saqlawiya Station, and the rehabilitation of the Eastern Province Station for the General Company for Central Electricity Distribution.
- Rehabilitation of the sewage center of victory and peace building – Directorate of sewage of Baghdad Governorate.
- Processing contracts for several projects in the public and private sectors.
- Design and implementation of several residential houses and villas in the Baghdad province and its suburbs, characterized by their large area, designs, and high-level implementation.
- The Managing Director and the architect, Mr. Jamal Ghadeeb, worked as a consulting engineer with the Romanian company Selena Krupp in the implementation and planning of the Ministry of Health building in the city of Erbil, Kurdistan Region.